MAINLINE AND LOADING AREA
January 2000
Mainline
is the far left track, siding adjacent and below mainline.
Siding climbs 2% grade to trestle abutment.
|
BACKSIDE OF TRESTLE
January 2000
Trestle
is temporarily in place. Mill Road has been roughed in
behind trestle.
|
AMERICAN FOREST PRODUCTS MILL
March 2001
Checking
the placement of mill buildings.
|
EASTERN VIEW OF WOODFORDS
March 2001
Mill road
has been built (center of pic) and a train is testing the
trestles before final placement.
|
EASTERN VIEW OF WOODFORDS
February 2002
Mill Road
is in the center looking downhill and loading area is to the
left. Trestle has been removed so rock work can be finished
on the abutment (near top/center of pic).
Notice in
this shot and in the pic to the right, that the loading area
tracks have 'pavement' around them . The pic to the left
shows the loading area before 'paving'.
|
WESTERN VIEW OF WOODFORDS
February 2002
Mill Road
is in the center looking uphill and loading area is to the
right. The abutment is awaiting final placement of the
trestle.
Loading
area to the right has been 'paved' and some rock work has
been added (near center of pic) between mainline and passing
track.
|
LOADING AREA
February 2002
Over all
shot showing final ground contours being put into place at
the AFP Mill site, Mainline is ballasted in
foreground.
|
AMERICAN FOREST PRODUCTS MILL
March 2002
Compare
this shot to the ones above and to the left. Buildings have
been placed to check final locations, pavement is nearly
completed and trackwork in this area is 90%
ballasted.
Also the
mountain in the background is beginning to take
shape.
|
AMERICAN FOREST PRODUCTS MILL LOADING
AREA
March 2002
Close up
of loading area showing track arrangement and building
locations.
To the
right, a track gang is working on one of the loading
spurs.
|