A very early shot of the trestle which has been temporarily installed to check the trackwork as well as getting to run some trains |
Mill road has been installed, rockwork near east abutment is under construction. Trestle has been removed to prevent damge during plaster work. |
Rock work will continue onto east abutment area, at right in picture. |
|
Mill buildings are being fitted for later installation. The trestle has been installed to check it's future mounting points and track alignment. |
Rockwork will cover a large portion of this mountain tunnel area. A snowshed will eventually protect the track switch at this remote location. |
Mainline has been ballasted. Rock work under construction between mainline and mill siding. |
If you compare this pic with the others you will notice quite a change has taken place. After some fine tuning of the scenery the trestle will be ready for final installation. A snowshed will partially cover the track where the diesels have just emerged from the tunnel. |
Same location as pic to the left but showing more of the trestle and rockwork. |